Zero downtime migrations at petabyte scale (2024) (planetscale.com)
mystifyingpoi 4 hours ago [-]
While this is cool and I dig it, I'm really, really thankful for maintenance windows at the current job. In the real world, 99.9% of systems aren't used 24/7/365. Just do the cutoff when everyone is asleep. Then restart everything to be sure.
Thaxll 5 hours ago [-]
We need more details on 6. This is the hard part, like you swap connection from A to B, but if B is not synced properly and you write to it then you start having diff between the two and there is no way back.

Like B is slightly out of date ( replication wise ) the service modify something, then A comes with change that modify the same data that you just wrote.

How do you ensure that B is up to date without stopping write to A ( no downtime ).

Kaliboy 18 minutes ago [-]
Not sure how they do it, but I would do it like so:

Have old database be master. Let new be a slave. Load in latest db dump, may take as long as it wants.

Then start replication and catch up on the delay.

You would need, depending on the db type, a load balancer/failover manager. PgBouncer and PgPoolII come to mind, but MySQL has some as well. Let that connect to the master and slave, connect the application to the database through that layer.

Then trigger a failover. That should be it.

mattlord 7 hours ago [-]
Blog post author here. I'm happy to answer any related questions you may have.
willquack 4 hours ago [-]
> you can run an initial VDiff, and then resume that one as you get closer to the cutover point.

VDiff (v2) only compares the source and destination at a specific point in time with resume only comparing rows with PK higher than the last one compared before it was paused. I assume this means:

1. VDiff doesn't catch updates to rows with PK lower than the point it was paused which could have become corrupt, and

2. VDiff doesn't continuously validate cdc changes meaning (unless you enforce extra downtime to run / resume a vdiff) you can never be 100% sure if your data is valid before SwitchTraffic

I'm curious if this is something customers even care about, or is point in time data validation sufficient enough to catch any issues that could occur during migrations?

mattlord 1 hours ago [-]
You are correct about resuming. If you do an initial VDiff and then resume that same VDiff say 1 month later it would only diff rows with a higher PK value.

But there's also nothing stopping you from doing a new VDiff to cover all data at that later point in time.

l5870uoo9y 2 hours ago [-]
What does it cost to host a 400TB database?
redwood 7 hours ago [-]
That 400TB in the image is a large database! I'm guessing that's not the largest in the PlanetScale fleet either. Very impressive and a reminder that you're strongly differentiated against some of the recent database upstarts in terms of battle tested mission critical scale. Out of curiosity how many of these large clusters are using your true managed 'as a service' offering or are they mostly in the bring your own cloud mode? Do you offer zero downtime migrations from bring your own cloud to true as a service?
mattlord 6 hours ago [-]
That particular cluster has grown significantly since the post was written, and yes there are now quite a few others that are challenging it for the "largest" claim. :-)

These larger ones are fully using the PlanetScale SaaS, but they are using Managed -- meaning that there are resources dedicated to and owned by them. You can read more about that here: https://planetscale.com/docs/vitess/managed

All of the PlanetScale features, including imports and online schema migrations or deployment requests (https://planetscale.com/docs/vitess/schema-changes/deploy-re...) are fully supported with PlaneScale Managed.

redwood 6 hours ago [-]
Understood: that's great for your customers' EDP negotiations with their cloud providers!
WaitWaitWha 6 hours ago [-]
I split step 4 in their "high level, this is the general flow for data migrations".

4.0 Freeze old system

4.1 Cut over application traffic to the new system.

4.2 merge any diff that happened between snapshot 1. and cutover 4.1

4.3 go live

to me, the above reduces the pressure on downtime because the merge is significantly smaller between freeze and go live, than trying to go live with entire environment. If timed well, the diff could be minuscule.

What they are describing is basically, live mirror the resource. Okay, that is fancy nice. Love to be able to do that. Some of us have a mildly chewed bubble gum, a foot of duct tape, and a shoestring.

dheera 4 hours ago [-]
Yeah it depends on what the system is.

Lots of systems can tolerate a lot more downtime than the armchair VPs want them to have.

If people don't access to Instagram for 6 hours, the world won't end. Gmail or AWS S3 is a different story. Therefore Instagram should give their engineers a break and permit a migration with downtime. It makes the job a lot easier, requires fewer engineers and cost, and is much less likely to have bugs.

ksec 6 hours ago [-]
Missing 2024 in the Title.
redwood 7 hours ago [-]
Worth underlining that this is data migrations from one database server or system to another rather than schema migrations
clarabennett26 7 hours ago [-]
[dead]